Site and planning context
Live parcel boundaries, zoning, planning overlays, flood extents and authority assets from Australian data services — Vicmap, planning schemes, Melbourne Water and utility authorities — on the project map from day one.
Most software sold as “land development software” is feasibility modelling: yield, funding, margin — then it stops. Engis is built for everything after the purchase decision: the subdivision itself, from planning permit through design, authorities and construction to Statement of Compliance and titled lots.
A land development project lives for years after the feasibility spreadsheet is closed. It moves through planning permits and their conditions, functional layout and detailed design, referral authorities and service agreements, tendering, civil construction, and finally subdivision compliance and titling. That is the phase of the project where most of the money is spent, most of the risk is realised, and most teams have the least system support.
Engis treats that delivery arc as the product. Site and planning context are on the map from day one — live parcels, zoning, overlays, flood and utility assets — and the same record then carries the project through every delivery phase to Statement of Compliance.
Acquisition gets a feasibility platform. Construction gets the contractor’s system. The land developer’s own multi-year delivery programme — approvals, design coordination, authority negotiations, consultant fees, claims — usually gets spreadsheets and inboxes. On a multi-stage subdivision that means the true state of the project exists nowhere except in the heads of the people running it.
One operating system across the land development lifecycle — structured around the phases Australian subdivisions actually run.
Live parcel boundaries, zoning, planning overlays, flood extents and authority assets from Australian data services — Vicmap, planning schemes, Melbourne Water and utility authorities — on the project map from day one.
Keep feasibility studies and site assessments on the project record, including an address-driven site report of planning constraints — so delivery starts from the assumptions the acquisition was made on.
Planning permit, functional layout, detailed design, tender, construction, Statement of Compliance — phases with budgets, status and a dependency-aware programme, rolled up across stages and projects.
A live permit condition register with AI extraction from planning documentation, linked to the referral authorities and phases each condition blocks.
Councils, water authorities and referral bodies tracked per project — submissions, responses, outstanding consents — instead of portal logins and email archaeology.
Consultant fee budgets by phase, live WIP, progress claims, variations and invoicing — with an available Xero integration that pushes claims and syncs payment status back.
A controlled document register with transmittals, RFIs and submittals, so the delivery paper trail is attached to the project it belongs to.
Delivery risks tracked against the projects and phases they threaten, reviewed as part of running the job.
Drop a fee proposal, contract or construction program and Engis reads it — extracting terms, conditions and programme structure into the record instead of leaving them in the PDF.
Portfolio visibility across stages and projects: phase status, approvals, spend and risk in one live view rather than a monthly report pack.
The day-to-day operating record — conditions, authorities, consultants, claims — structured instead of scattered.
The delivery record and the consultancy’s commercial position — fees, WIP, timesheets, claims — in the same system.
The authority side of the same workflows: applications, referrals, engineering approvals and asset handover.
Excellent at the acquisition question — yield, funding stacks, margin. They end where the project begins. Engis holds the site context but is built for the delivery years that follow.
Built for a head contractor’s site production and subcontractor administration. The developer’s programme — permits, authorities, design, compliance — sits outside it.
Boards and task lists don’t know what a permit condition, referral authority, progress claim or Statement of Compliance is. The Australian delivery domain is the product here, not a template.
No — and that is deliberate. Engis keeps feasibility studies and live site constraints on the record, but it is built for delivery: the phases, approvals, authorities, commercial control and compliance that run from planning permit to titled lots. If your main need is acquisition modelling, a dedicated feasibility platform is the right tool; Engis is the system for the project you proceed with.
Yes. The phase model runs planning permit, functional layout plan, detailed design, tender, construction and Statement of Compliance — the arc of an Australian subdivision — with permit conditions, referral authorities and compliance tracked as first-class records.
Live layers from Australian authority services, including Vicmap parcels and planning zones and overlays, Melbourne Water flood and drainage assets, and water utility networks across multiple states — rendered on an interactive map inside the project workspace.
Yes. Projects and stages roll up into portfolio dashboards, so phase status, approvals and commercial position are visible across the whole book of work, not one job at a time.
Access is provisioned per firm. Request a three-day sandbox preview on synthetic data, book a demo, or contact the team.
See a multi-stage land development run in one operating system — request sandbox access or book a 20-minute demo.
Australian Hosted · Australian Data Residency