Application lifecycle
Applications tracked through their full arc — pre-application, lodgement, assessment, further information, referral, conditions, decision and issue — with a statutory clock that pauses correctly while further information is outstanding.
Referral coordination
Referrals to internal teams and external authorities tracked as records with real states — pending, in progress, no objection, conditions, objected — so the referral board is a view, not a chase list.
Engineering approvals
Detailed design assessment and approval tracked as explicit stages after the permit, where the development engineering workload actually lives.
Civil delivery milestones
The post-permit sequence modelled as milestones: pre-commencement meeting, commencement, CCTV review and rectification, as-constructed submission, practical completion, defect liability walkthrough, final completion and bond return.
Inspections and defects
Scheduled inspections — pre-start, routine, hold point, practical completion, defect liability, final acceptance — with pass and fail outcomes recorded, and defects tracked through to close-out.
Asset handover capture
As-constructed drainage, road, sewer and water assets captured spatially and exportable as GeoJSON — structured data for the asset register, not a PDF to be re-digitised.
Council reporting
Application, referral and inspection metrics reported from the same records the work runs on — no separate reporting spreadsheet to maintain.
Permit conditions, both sides
The conditions a council issues are the conditions delivery teams track in Engis — same vocabulary, same structure, which is what makes the counter faster in both directions.
Spatial context
Zoning, overlays, flood extents and authority assets from live Australian data services on the map beside each application.